Our Services
A bathroom remodel typically costs $5,000–$30,000 depending on scope, tile selection, fixture grade, and whether structural changes are involved. Southern California's older housing stock adds complexity — original builders often used greenboard drywall as the shower substrate instead of cement board, requiring proper remediation before any new tile or waterproofing goes down.
Solomon Moss handles every phase: demo, waterproofing with Schluter-Kerdi sheet membrane and sealed seams, tile installation, vanity and fixture setting, and final inspections. Licensed in California, flat-rate scoped after a free on-site evaluation, quoted with no hidden line items.
Demo to studs, waterproofing, tile, cabinetry, vanity, fixtures, and inspections — all under one contractor. No gaps between trades, no handoff confusion.
Sheet membrane with sealed seams at every corner and penetration, slope-verified floor, tested before tile. The standard that separates a 20-year shower from one that fails in five.
Tub removal, drain relocation, shower pan framing, full sheet-membrane waterproofing, and custom tile — curbed or curbless. Most alcove conversions fit within the 3–5 week timeline.
Vanity selection happens at scoping — not after demo — so rough-in dimensions, countertop templating, and finish work all align without callbacks.
Any remodel touching plumbing, electrical, or mechanical in California requires a permit. We pull it before work starts. The fee and inspection coordination are in the flat-rate price.
No surprise line items after demo starts. Every scope is evaluated in person first and quoted as a flat rate — what we quote is what you pay.
Bathroom remodels typically range from $5,000 for a basic hall bath refresh to $30,000 or more for a full master bath gut-and-rebuild with custom tile, a walk-in shower, and high-end fixtures. The biggest cost drivers are scope, tile material, fixture grade, and whether structural or layout changes are involved.
A standard hall bath runs 3–5 weeks of active work. A master bath with a custom walk-in shower, double vanity, or freestanding tub typically runs 5–8 weeks. Custom vanity cabinets run 4–6 weeks lead time — ordered during the design phase to avoid timeline gaps.
Yes. Any bathroom remodel involving plumbing, electrical, or mechanical changes in California requires a building permit and phase inspections. Solomon Moss pulls the permit before work starts. The permit fee is included in the flat-rate price.
Schluter-Kerdi is a fabric-reinforced sheet membrane applied to the substrate before tile. It creates a continuous moisture barrier with sealed seams at corners and penetrations, and a floor sloped to drain. Unlike spray coatings, it is testable before tile goes down — the most reliable way to prevent the water intrusion that causes mold, rot, and structural damage behind showers.
Yes — tub-to-shower conversions are one of the most common scopes. The process involves removing the tub, reconfiguring the drain if needed, framing the shower pan, waterproofing all wet surfaces with sheet membrane, and tiling the enclosure. Both curbed and curbless walk-in designs are buildable.